Things left to be done
A list of things still left to be done before the bathroom is considered finished.
-Order clawfoot tub
-Install clawfoot tub
-Frame closet
-Put up Drywall
-Install Wainscotting
-Patch holes
-Plaster
-Texturize new walls
-Paint
-Install trim along top of wainscotting and baseboards
- Buy towels and rugs and accessories :-)
Who knows how long thats all gonna take. But as long as we have sinks to brush our teeth, a shower to get clean, and a toilet the bathroom is useable.
-Order clawfoot tub
-Install clawfoot tub
-Frame closet
-Put up Drywall
-Install Wainscotting
-Patch holes
-Plaster
-Texturize new walls
-Paint
-Install trim along top of wainscotting and baseboards
- Buy towels and rugs and accessories :-)
Who knows how long thats all gonna take. But as long as we have sinks to brush our teeth, a shower to get clean, and a toilet the bathroom is useable.


3 Comments:
I believe this calls for a "Woot!"
By
Proud Mum, at 10:23 AM
This comment has been removed by the author.
By
Anonymous, at 3:33 AM
All this thing can be done with proper step before finishing bathroom remodel,with proper installation of all accessaries according to space requirement.
Bathroom Remodeling Contractor
By
Anonymous, at 3:41 AM
Post a Comment
<< Home